Community Action Project
The construction of a house for a low income resident.
Site Activity
01/30/98 ....Finishing Touches
12/17/97 ....Tile
12/15/97 ....Paint and Clean Up
12/11/97 ....Interior Paint
12/08/97 ....Interior Trim
12/04/97 ....Drywall Tape and Float
12/01/97 ....Drywall and Brick Continue
11/25/97 ....Siding Finishes
11/24/97 ....Siding Progresses
11/21/97 ....Siding
11/19/97 ....Inspection and Vapor Barrier
11/18/97 ....Insulation and Siding
11/10/97 ....Interior Framing
11/05/97 ....Plumbing and Electrical
11/03/97 ....Interior Work Begins
10/30/97 ....Roofing
10/22/97 ....Roof Decking
10/20/97 ....Rafters
10/14/97 ....Porch and Carport Concrete
10/13/97 ....Framing Takes Shape
10/10/97 ....Framing Starts
10/06/97 ....Slab Preparation
10/03/97 ....Plumbing
10/01/97 ....Formwork
09/26/97 ....Site Preparation
09/24/97 ....Gound Breaking